Left arrow icon
Right arrow icon
Q4 2024

Chigwell Basement

Project scope:

☆ Installation of 700m² A393 mesh to the walls✓

☆ 40m of single sided formwork 3m high installed for each of the two straight wall pours✓

                                            ☆20m of radial wall susccesfully poured to 3m                                              high✓

‍

What our client has to say:

Callum and his team have worked with us a few times now and the quality of work has always been great! Brilliant guy, brilliant service

Jamie Atkins-director

‍